Plans are underway for a total retrofit of the mall shopping areas through all the phases. This page was last modified on 19 December , at The damage was promptly repaired. The large shelter building at the transit centre is accessible and equipped with power doors. In the summer of , the mall’s dinner theatre was relocated and Edmonton’s second branch of Bed, Bath and Beyond opened in the dinner theatre’s old location above the west-end food court. The Royal Canadian Mounted Police also indicated that there was no evidence of any imminent threat.